
Más información sobre el libro
Covers the entire process of risk management by providing methodologies for determining the sources of engineering project risk, and once threats have been identified, managing them identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.); implementation of measures for their prevention, reduction or mitigation; evaluation of impacts and quantification of risks and establishment of control measures. It also considers sensitivity analysis to determine the influence of uncertain parameters values on different project results, such as completion time, total costs, etc. Case studies and examples across a wide spectrum of engineering projects discuss such diverse factors safety; environmental impacts; societal reactions; time and cost overruns; quality control; legal issues; financial considerations; and political risk, making this suitable for undergraduates and graduates in grasping the fundamentals of risk management.
Compra de libros
Risk Management for Engineering Projects, Nolberto Munier
- Idioma
- Publicado en
- 2014
- Encuadernación
- (Tapa dura)
Métodos de pago
Nadie lo ha calificado todavía.
- Título
- Risk Management for Engineering Projects
- Subtítulo
- Procedures, Methods and Tools
- Idioma
- Inglés
- Autores
- Nolberto Munier
- Editorial
- Springer
- Publicado en
- 2014
- Formato
- Tapa dura
- Páginas
- 230
- ISBN10
- 3319052500
- ISBN13
- 9783319052502
- Serie
- Etiquetas
- Ciencia, Tecnología, Literatura especializada, Ingeniería, Industria, Gestión de proyectos, Biotecnología, Ingeniería civil
- Descripción
- Covers the entire process of risk management by providing methodologies for determining the sources of engineering project risk, and once threats have been identified, managing them identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.); implementation of measures for their prevention, reduction or mitigation; evaluation of impacts and quantification of risks and establishment of control measures. It also considers sensitivity analysis to determine the influence of uncertain parameters values on different project results, such as completion time, total costs, etc. Case studies and examples across a wide spectrum of engineering projects discuss such diverse factors safety; environmental impacts; societal reactions; time and cost overruns; quality control; legal issues; financial considerations; and political risk, making this suitable for undergraduates and graduates in grasping the fundamentals of risk management.